Demolition site restoration. The reconstruction of the Spiral Theater at the Exhibition Grounds begins
In the days you get a building to renovate these construction companies. The theater should reopen in the second half of next year. In addition, a new hall will be created from the former rehearsal room and the facilities for the actors will be improved.
The reconstruction includes the replacement of the roofs, the repair of the perimeter cladding and the repair of the elevator connecting the basement facilities for the actors and the roofs, under which space will also be created for the accommodation of the guest actors. In addition, there will also be a low ring extension with a grassy roof, which will serve as a backstage.
Testimonials have shown that I believe leaving the building with the floods in 2002 did not disturb the statics. The total costs should be around 153.2 crowns and include the necessary technologies.
It has a capacity of 550 spectators in the gallery and up to 300 spectators in the new underground scene. In addition to the theater, the halls will also be used for concerts, conferences, talk shows and other commercial events in order for the theater to earn its living.
“It already seemed that the Spiral Theater would do badly. The once famous scene, where thousands of Praguers saw the musical Jesus Christ Superstar, has been dilapidated for almost twenty years. It is a shame that the politicians left it that way and in the last election period they even consecrated a demolition site for the entire building. We managed to save the unique circular scene and prepare a new use. Of course, the famous spiral ramps surrounding the stage will remain. We will open a new stage from the former rehearsal room and equip both rooms with today’s technologies, ”said Deputy Mayor Pavel Vyhnánek, who is in charge of the Prague Exhibition Grounds.