A7 Moldova highway. The tender for the Bacău-Paşcani section was launched
The Minister of Transport, Sorin Grindeanu, announced last night that the tender was launched for the three lots of the highway to be built between Bacău and Pașcani, part of the A7 Moldova Highway. The deadline for submitting offers is September 15.
The three lots of the Bacău – Paşcani Highway have a total of 77.38 kilometers.
“Contracts for the construction of the 3 lots of the Bacău-Pașcani Freeway were launched in the auction! Today, CNAIR submitted in SICAP the notice of participation for the construction of the 77.39 km of this highway, which is part of the A7 (Moldova Highway). The notice of participation for the 3 lots will be visible in SICAP immediately after its publication in the Official Journal of the European Union. The deadline for submitting offers is 15.09.2022”, Sorin Grindeanu announced on Facebook.
According to the Minister of Transport, the three lots are:
Lot 1: (Săuceşti – Trifeşti), will have a length of 30.3 km and an estimated value of 2,041 billion lei (without VAT)
Lot 2: (Trifeşti-Gherăeşti), will have a length of 18.99 km and an estimated value of 1,601 billion lei (without VAT)
Lot 3: (Mircesti-Pașcani), will have a length of 28.09 km and an estimated value of 2.215 billion lei (without VAT)
The execution of the insurance of the lot will last 30 months, and the total value of 5.858 billion lei (without VAT), of the works, will be insured by PNRR.