Next year, for six months without WKD, to the center of Warsaw
The reconstruction of Warsaw West will affect the organization of the Warsaw Commuter Railway trains. It is known that it will be necessary in about a year. trains to the Warszawa Śródmieście WKD station run for half a year. Temporary turnouts will be built in the area of the Warszawa Reduta Ordona stop.
Is the Commuter Railway getting ready, Warsaw is working on from platform No. 1. – every three months, a series of meetings with PKP PLK on Western Warsaw. Recent meetings show that on March 1, 2023, wukadka trains will be allowed to travel. stick to the Warszawa Reduta Ordona stop. We assume that the break may last approx. 6 months – says Michał Panfil, president of WKD.
In order for train traffic to become so long, it is necessary to adapt to Warsaw Reduta Ord. – We are at the stage of designing the turnout system in this place. For now, the buildings are temporary, but when it comes to conditions, it may be possible to steer and steer the control system – Krzysztof Kulsza, spokesman of the WKD. It is known that, however, instead of having to be forced to cut back – every 12-15 minutes every 10 minutes. The launch will be replaced by the group members with KM and SKM trains on the basis of a valid wukadka ticket.