Rome, here are all the closures and deviations of the Eur district during the E-Prix days
The historic district EUR will be the theater of the Rome E-Prix. Because of this the area will, as early as April 3, be affected by changes in regular mobilityboth of the bus network and to allow the assembly and s necessary for the Formula E race to be held in the days of 9 and 10 April.
Rome, “S line” tourist bus stop in support of Atac to avoid crowds
Diversions and closures
From Sunday 3 April the bus terminus will be moved from piazzale dell’Agricoltura to piazzale don Luigi Sturzowhile the taxi area, from 5 to 14 April, will no longer be found in piazzale Marconi, but in boulevard Asia. As for private mobility, from 7 to 11 April closed the stretch of road belonging to via Cristoforo Colombo between viale Europa and via delle Tre Fontane. On the same days, precisely from 20.30 to 5.30, the so-called “green perimeter” within which the race circuit will be set up, as well as the ramps of the Viaduct of the Magliana – A90 in the direction of Eur. The off-limits area will be between viale del Pattinaggio, Via delle Tre Fontane, viale di Val Fiorita, viale Egeo, piazzale Ferruccio Parri, viale Tupini and viale Ss Pietro e Paolo, piazza Caduti sul Lavoro, viale Beethoven , viale Asia, viale dell ‘Arte and viale dell’Artigianato, viale dell’Atletica. Finally, traffic towards the Grande Raccordo Anulare will be diverted to via Laurentina and via Oceano Atlantico, while towards the center on via Laurentina, via Perna, via Cristoforo Colombo and viale Marconi.
The words of the commissioner
The Councilor for Major Events, Sport, Tourism and Fashion of Rome Capital Alessandro Onorato has expressed solutions to avoid discomfort to mobility: “With the support of the technicians of Rome Mobility Services and of the organization’s Mobility Managers, we have developed a plan of interventions to bring traffic together on multiple differential routes in order to minimize traffic problems and therefore minimize traffic inconvenience to citizens. It will be the responsibility of the Administration to provide the citizens, and in particular the residents and traders of the interested quadrant, with all possible information, on multiple communication channels, on the alternative routes to be taken during the days of preparation, tenders and dismantling “.
Metro A and B, Hitachi’s appeal upheld: checks on the attribution of scores