Thessaloniki: The works for the Metropolitan Park of Pavlos Melas continue (PHOTO)
From week to week, the former camp of Pavlos Melas, the abandoned public space of 340 acres, is transformed into the Metropolitan Park of greenery, culture, history, recreation. With a focus on people, the Municipal Authority of the Municipality of Pavlos Melas designed and designed, under the supervision of the Technical Services, a historic big CHANGE in practice, which will create new relationships with the environment for the residents and citizens of MPP.
During the last week (February 14-26), the works of renewal and protection of the existing vegetation continued, with cutting of trees (pines, acacias, ligustra) as well as meticulous twigs in old pines, mainly in the area of memory, in the “square” ‘. with the emphatic presence of the two historic barracks buildings A2 and A3 of the former camp.
Also, the construction of an important infrastructure project has started, specifically, the rainwater drainage pipeline, while the southeastern end of the park is being formed, near Davaki Street, with relatively strong altitude differences. The works in the transfer and deposition of soil, in order to create a new, smooth, safe, horizontal terrain for the area that will host leisure and creative uses, in the Metropolitan Park of Pavlos Melas.
“We are excited, because a former camp located on the borders of the Municipality of Pavlos Melas, in the urban fabric, is entering a new era. The play “Environmental upgrade and performance in Sharing the Metropolitan Park of Pavlos Melas”, which started just three months ago, is only the beginning of our emblematic interventions for the creation of MPP, a strong development of our place. Local government is directly related to the issues of society and must solve not only the obvious, the smaller, the daily concerns of the residents but also the larger ones, those that seem to have stagnated. We do not promise “in general and vaguely”, we do not look for excuses, we work seriously, with plans and results, for the present and the future of our city “notes the Mayor of Pavlos Mela Dimitris Demourtzidis for the satisfactory progress of the works in the under construction MPM.
SWIDE TO THE LEFT
SWIDE RIGHT