work on the Ceccarini underpass and the gym in via Ionio
The new flooring of the Ceccarini underpass in the central part under the railway line will be completed for the Christmas winter season. These days the workers are working to assemble the part of the stretch towards the sea. It should also be remembered that the underpass was never closed, even with the start of work on the underground section between the stretch of water and the ramp on the sea side. Work is therefore underway on the construction of the new flooring, lighting, side cladding, and interventions on the ceiling. The spotlight lighting, as is known, will be modulated according to the needs of use, in order to create a scenographic place during the day, well lit at night. The refurbished ceiling will have the same smoothing treatment as in the previous part, the floor is in Lipica Fiorito stone, the perimeter walls, now in white-gray grit, will instead have a wooden cladding in Siberian larch staves, also these in continuity, as dimensions, section and color, to those visible in the other sections of the underpass while the wall of the central body of the underpass is harmonized with the flooring and the ceiling, as the aim of the project is to bring out the wooden cladding of the walls. “The new look of the Ceccarini underpass is the work that makes us particularly proud – said the commissioner for Public Works, Lea Ermeti -. Let’s just think of the fact that the architecture critic Francesco Pagliari has included the new Ceccarini underpass in the annual publication of The Plan, selecting it from various residential projects, industrial buildings and service interventions. Without a soul and without identity. Today we have also verified that work is also being carried out on the viale Ionio gymnasium. the scaffolding that needs all the changes to the pillars of the foundations. slowdown due to the well-known issues of Covid and the difficulty of finding material with government bonuses on construction, public works are resuming at full speed “. As is well known, the low environmental impact reconstruction works of the gymnasium of the 1st grade school “F. The new building will be completely renovated in terms of height, structural systems, seismic adaptation and performance standards. The design of Studio Thesis will follow, the same who designed the gym in via Alghero The structure will have walls covered entirely in wood, a uniform height of 7 meters, compared to the current body, which consists of a difference for an area of 500 square meters . It will have the external thermal coat and in the changing rooms with new lighting and heating systems suitable for guaranteeing good insulation and energy saving.
Cs Municipality of Riccione
Copyright ©