how much funds for this side — EADaily, October 7, 2022 — Economy news, Russian News
The Government of the Russian Federation allocated 40.8 billion rubles from the reserve fund to the Ministry of Transport for the construction of the M-12 high-speed highway. It is being built within the framework of the federal project “Construction of highways for international transport of the Europe-Western China corridor.”
The order of the court, posted on the official website of the expected date, contains a message about the construction of the M-12 Moscow-Nizhny Novgorod-Kazan high-speed highway.
The total length of the M-12 project from Moscow to Yekaterinburg is about 1.6 thousand km. The M-12 motorway, 811 km long, will pass through the Moscow, Vladimir, Nizhny Novgorod regions, the Republics of Chuvashia and Tatarstan. It will unite 17 large deposit centers. The route will be connected to the network of high-speed roads of the European part of Russia (M-11 Neva, Central Ring Road, M-3 Ukraine, M-1 Belarus, M-4 Don).
According to the passport of the state program “Development of the transport system”, further financing of the federal project “Construction of highways of the international corridor (ITC) Europe – Western China” will be as follows: in 2023 – 25.5 billion rubles, and in 2024 – about 64.2 billion rubles.