The repair of the Barrandov Bridge will not work, the ramp to Strakonice will disappear
The demolition of the ramps of the Barrandov Bridge ramp from Strakonice reached the finale. (24-05-2022)
| photo:
Michal Rika,
MAFRA
The overall renovation began on Monday, May 16, and the storm ramp was fully completed on Wednesday, May 18. Traffic restrictions during the download period from two lanes to one, this bird should end on this section near Strakonice.
According to the Technical Administration of Communications of the Capital City of Prague (TSK), Barbora Likov is on time, the work is almost done, she told the iDNES.cz editorial office. After the demolition of the now ramp, the construction of the new
The repair of the bridge from 1983, which is part of the city ring, began to cut the road and is spread over several years. This year, it will last 110 days and will cost 594.5 million crowns. The workers work as I allow them to view the hygiene from 6 to 22 hours.
I would work with the possibility of accidents, to the analyst of the Barrandov Bridge |
There were no traffic problems on the repaired bridge yet. In the meantime, he will close the typical early traffic peaks, but nothing extraordinary, said Adam Scheinherr, the mayor of transport, in an interview with MF DNES. According to him, Prague was ready for repairs.
iii should, during the repairs of the bridge, which is the busiest road in Prague, use according to TSK bypass routes, which lead mainly along the Prague ring road, where the Psnice ramp was temporarily opened. mru in Zbraslav.
TSK also recommends that you use mobile applications that find the optimal route for storing real traffic data.