OX2 transfers Åndberg wind farm in Sweden
Published by
Abi Larkin,
Editorial Assistant
Energy Global,
OX2 hands over the Åndberg wind farm in Sweden to the private investment house Ardian. With 53 wind turbines and a total capacity of 286 MW, Åndberg is OX2’s second largest wind farm to be put into operation in Sweden.
In 2018, OX2 acquired and began developing the Åndberg wind farm in Härjedalen. In 2019, the project was sold to Ardian and as part of the agreement, OX2 signed a contract to build the wind farm under an EPC agreement.
The wind farm’s annual energy production is 800 GWh, which corresponds to the annual electricity consumption for more than 160,000 households (5,000 kWh / household).
“We are pleased to be able to hand over the Åndberg wind farm to Ardian today. I would like to extend a special thank you for the efforts made by the expanded project team to deliver the wind farm during [COVID-19] pandemic “, says Paul Stormoen, CEO, OX2 AB.
OX2 will continue to be responsible for the technical and commercial management of the wind farm.
OX2 currently has 1352 MW of new wind power capacity under construction and a total of 3.2 GW of wind farms in technical and commercial management.
For more news and technical articles from the global renewable industry, read the latest issue of Energy Global magazine.
Energy Global’s spring issue 2022
The spring 2022 issue of Energy Global contains a number of technical articles on energy storage, wind, solar, waste for energy and more. In addition, this issue also contains a regional report on the renewable energy market in Asia.
Read the article online at: https://www.energyglobal.com/wind/23052022/ox2-hands-over-ndberg-wind-farm-in-sweden/